Elephant corridors in Chunati disrupted by infrastructure works
A key route at the Satghar corridor has been effectively blocked for nearly two months as a 900-metre section of the Chattogram-Cox’s Bazar highway is widened to four lanes, preventing elephants from crossing between forest habitats on either side.
Covered by 1 source ·
Every side
-
TBS News Independent
A key route at the Satghar corridor has been effectively blocked for nearly two months as a 900-metre section of the Chattogram-Cox’s Bazar highway is widened to four lanes, preventing elephants from crossing between forest habitats on either side.