Voice News BD

Rooppur Unit-1 reaches minimum control level

The next stage is testing the reactor at various power levels, followed by connection of the unit to the national power grid, says the Embassy of Russia in Bangladesh.

Covered by 1 source ·

Every side

  • TBS News Independent
    The Business Standard Ltd · independent

    The next stage is testing the reactor at various power levels, followed by connection of the unit to the national power grid, says the Embassy of Russia in Bangladesh.

    Read original →

← All stories on Voice News BD