Voice News BD

Tangail bridge: Engineer transferred over alleged bamboo use instead of steel rods in footpath slab

The move follows allegations that bamboo was used instead of steel rods in the bridge’s footpath slab.

Covered by 1 source ·

Every side

  • TBS News Independent
    The Business Standard Ltd · independent

    The move follows allegations that bamboo was used instead of steel rods in the bridge’s footpath slab.

    Read original →

← All stories on Voice News BD