Tender soon for 442MW Rampal solar project
The BPDB chairman said the plant would be built on 918.50 acres of land in Block-B of Rampal, which the BPDB has already acquired and developed.
Covered by 1 source ·
Every side
-
TBS News Independent
The BPDB chairman said the plant would be built on 918.50 acres of land in Block-B of Rampal, which the BPDB has already acquired and developed.